{"id":75,"date":"2024-10-15T13:57:51","date_gmt":"2024-10-15T10:57:51","guid":{"rendered":"https:\/\/www.sargininsaat.com\/en\/?page_id=75"},"modified":"2025-01-29T15:01:38","modified_gmt":"2025-01-29T12:01:38","slug":"international-project","status":"publish","type":"page","link":"https:\/\/www.sargininsaat.com\/en\/international-project\/","title":{"rendered":"INTERNATIONAL PROJECTS"},"content":{"rendered":"\n<p><strong>2013 \u2013 BIN LADIN GROUP<\/strong><br>Waterproofing Works of Highway, Pedestrian Crossing Tunnels in Mecca &#8211; Haram Area \/ MAKKAH<\/p>\n\n\n\n<p><strong>2013 \u2013 BIN LADIN GROUP<\/strong><br>Jamarat Phase 3 Shoaibain Link Project,<br>Highway Tunnel Lining Concrete, Steel Shoring and Steel Reinforcement Works \/ MAKKAH<\/p>\n\n\n\n<p><strong>2008 \u2013 BECHTEL \u2013 ENKA J.V.<\/strong><br>Rreshen &#8211; Kalimash Highway Tunnel Excavation, Waterproofing, Concrete Works \/ ALBANIA<\/p>\n\n\n\n<p><strong>2006 \u2013 GAMA INDUSRTY ARABIA LTD.<\/strong><br>Yamam 5 Project, Under Cement Silo C119 Section 1 Tunnel Construction Excavation and Supporting Works \/ RIYAD<\/p>\n\n\n\n<p><strong>2005 \u2013 MINISTRY OF WATER AND ELECTRICITY AFFAIRS, KINGDOM OF SAUDI ARABIA<\/strong><br>Upstream and Downstream Cofferdams Drilling &amp; Injection Works within the Scope of Al-Lith Dam Project \/ JEDDAH<\/p>\n\n\n\n<p><strong>2005 \u2013 MINISTRY OF WATER AND ELECTRICITY AFFAIRS, KINGDOM OF SAUDI ARABIA<\/strong><br>Construction of Diversion Tunnel and Access Gallery within the Scope of Al-Lith Dam Project \/ JEDDAH<\/p>\n\n\n\n<p><strong>2005 \u2013 ALAWI TUNSI<\/strong><br>Tunnel Waterproofing and Lining Works between Mina and Al-Muaysim within the scope of King Khalid Bridge Extension to Al-Muaysim Road Section 2 Project (Section II) \/ MAKKAH<\/p>\n\n\n\n<p><strong>2005 \u2013 Y\u00dcKSEL\u00a0\u0130N\u015eAAT\u00a0SAUDIA CO.\u00a0<\/strong><br>Murwani Dam Project, Diversion Tunnel Excavation and Tunnel Lining Concrete Works \/ C\u0130DDE<\/p>\n\n\n\n<p><strong>2004 \u2013 ZAFER\u00a0\u0130N\u015eAAT\u00a0A.\u015e.<\/strong><br>Apron and Waste Water Treatment Plant Earthworks \/ BALAD<\/p>\n\n\n\n<p><strong>2004 \u2013 ALAWI TUNSI<\/strong><br>Tunnel Excavation and Fortification Works between Mina and Al-Muaysim within the scope of King Khalid Bridge Extension to Al-Muaysim Road Section 2 Project (Section I) \/ MAKKAH<\/p>\n\n\n\n<p><strong>2003 \u2013 ZAFER\u00a0\u0130N\u015eAAT\u00a0A.\u015e.<\/strong><br>US Army Corps Tbilisi Helicopter Aircraft Parking Area Arrangement Work \/ TIFLIS<\/p>\n","protected":false},"excerpt":{"rendered":"<p>2013 \u2013 BIN LADIN GROUPWaterproofing Works of Highway, Pedestrian Crossing Tunnels in Mecca &#8211; Haram Area \/ MAKKAH 2013 \u2013 BIN LADIN GROUPJamarat Phase 3 Shoaibain Link Project,Highway Tunnel Lining Concrete, Steel Shoring and Steel Reinforcement Works \/ MAKKAH 2008 \u2013 BECHTEL \u2013 ENKA J.V.Rreshen &#8211; Kalimash Highway Tunnel Excavation, Waterproofing, Concrete Works \/ ALBANIA &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.sargininsaat.com\/en\/international-project\/\" class=\"more-link\">Okumaya devam et<span class=\"screen-reader-text\"> &#8220;INTERNATIONAL PROJECTS&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-75","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.sargininsaat.com\/en\/wp-json\/wp\/v2\/pages\/75","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sargininsaat.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.sargininsaat.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.sargininsaat.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sargininsaat.com\/en\/wp-json\/wp\/v2\/comments?post=75"}],"version-history":[{"count":18,"href":"https:\/\/www.sargininsaat.com\/en\/wp-json\/wp\/v2\/pages\/75\/revisions"}],"predecessor-version":[{"id":889,"href":"https:\/\/www.sargininsaat.com\/en\/wp-json\/wp\/v2\/pages\/75\/revisions\/889"}],"wp:attachment":[{"href":"https:\/\/www.sargininsaat.com\/en\/wp-json\/wp\/v2\/media?parent=75"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}